Page tree




Campus

# of GA Classrooms/# w/technology

Who owns classroom budget?

Install & Maintenance Staff

Faculty Support FTE (for classrooms)

Recharge Staff

Systems for managing technology in classrooms handling trouble tickets, classroom trouble calls

Other

UC BERKELEY

220 total; 193 with tech

ETS for technology, in partnership with Registrar and Physical Plant. Registrar has small physical maintenance budget and some refresh funds.  Most of the physical maintenance is with Physical Plant.

6.5 FTE:  Manager, .5 TV Engineer; 1 Sr. TV Tech installer; 1 Sr. TV tech night maintenance; 1 Pr TV tech day; 1 Programmer Analyst for AMX; 1 Design & Project Mgt Engineer (GA installs, refresh, recharge). About 10 room check students (light maintenance)

5.0:  1 Manager; 3 Sr. Prod-Director just-in-time support & facilities staffing (including videoconf); 1 help desk, 1 coursecast administrator; About 20 students.

Special Events:  4.75 + hourly staff: 1 Manager;  .75 Client intake coordinator; 1.0 Special Events technical coord (also works events); 1 post-production manager; 1 Sr. Prod Director events tech; multiple freelancers

AMX control system; home grown checkout and trouble ticket system (looking to replace); Google docs; Schedule Source for student scheduling (phasing out)

 

UC DAVIS

127; all have tech

The Registrar owns the budget for technology and and labor and pays ATS for labor and equipment for new installations and upgrades through a recharge process.  ATS owns the budget for the maintenance of the classrooms; i.e. physical checking of the technology in each classroom to ensure it is working properly and fixing it if there is a problem.

Install staff:  1.8 FTE (allocation of staff); Maintenance staff:  2.10 FTE (including a Night Crew supervisor) and 5 student employees; and one 1.0 FTE AV Engineering Manager who manages the install and maintenance staff.

1.0 FTE:  We have one staff dedicated to assist the faculty at a moment's notice during 8-5 (our Quick Response person).  We also have a 1.0 FTE who is responsible for Equipment Loand and Video Conferencing.

Equipment Loan: 0.6 ; Video Conferencing: 0.25 ; Media Production: 3.67; Graphic Design: 1.0; Installation: 1.8; Computer Classrooms/Printing:  0.7; Programming:  1.95

Home grown inventory shadow system; home grown equipment check-out system; SmartSite (UCD's version of Sakai)

 

UC IRVINE

133 total; 131 with technology

The Office of Information Technology for technology maintenance/support.  We have no current source for refresh funds.  Tech installations have been covered by special projects or building funds. Facilities Management covers most of the physical (non-tech) maintenance of classrooms.

2.0 FTE split between computer techs, sr. AV techs, and maintenance staff.  (Sometimes interchangeable with faculty support staff.)

6.0 FTE covering help desk (7a-8p), emergency response, daily maintenance, and associated admin tasks.  3 student workers cover late night and weekend support (30+ hrs/wk).

1.0 FTE for equipment will-call and associated admin tasks.

AMX control system for all rooms w/Classroom Manager for monitoring/scheduling; Google Docs and homegrown datbase for job tracking/recharges/student scheduling; Johnson Controls Pegasys2000 for room security scheduling and issuing keycards to after hours groups; Numara Footprints for trouble tickets/issue tracking; Wasp MobileAsset for inventory.

4 computer labs and 1 conference/test room with similar AMX control systems and equipment are maintained by the same GA classroom staff.

UC LOS ANGELES

 

 

 

 

 

 

 

UC RIVERSIDE

87 total General Assignment Classrooms-all are technology ready

Associate Vice Chancellor of Computing & Communications owns G.A. classroom technology budget.  Registrars owns classrooms and physical appointments (possible budget).  Physical Plant has budget for classroom maintenance.

2.0 FTE in support of classroom installations and maintenance.  Four staff are cross trained to support maintenance operation during breaks.

2.0 FTE responsible for faculty support in classrooms, plus 30 student employees.  All (6) professional staff are cross trained to support day-to-day operation during peak periods

1.0 FTE for recharge.  Two staff members support recharge 50% of time, plus student employees as needed.

Media 2010-A web campus based billing system is used for all Recharge/events/functions.Extron Global Viewer Enterprise used for security, monitoring and basic system maintenance.  MS Outlook general account- Email and Tasks are used as trouble tickets.

 

UC SAN DIEGO

109

 

 

 

 

 

 

UC SANTA BARBARA

 

 

 

 

 

 

 

UC SANTA CRUZ

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



 

 

 

 

 

 

 

 

  • No labels